What You Actually Need to Know Before Starting a Project Like This

Most people coming into Ts Construction Building Excellence Engineering Marvels A Symphony Of Innovation And Expertise think the hard part is getting the design right. It is not. The hard part is keeping every discipline from stepping on each other when the drawings get complicated enough that three different subcontractors need access to the same coordinate system at the same time. I learned that the hard way on a mid-rise commercial job a few years back. We had a facade system that required embedded plates positioned within 3mm of theoretical, while the structural steel was being erected in the bay next door by a different crew. The BIM model showed everything fine on screen. On site, the plates were off by 18mm because the concrete pour for the foundation slab had shifted the reference points slightly and nobody caught it during the weekly coordination meeting. You fix that by going back to the structural engineer, issuing a field change, and grinding out the plates, which costs you about two days and roughly forty thousand dollars in rework. That is the reality of this kind of work. It is not glamorous.

Ts Construction Building Excellence Engineering Marvels A Symphony Of Innovation And Expertise

The term gets thrown around a lot in marketing materials, but at its core it describes a project delivery approach where design, engineering, and construction are treated as a single integrated workflow rather than a sequence of handoffs. The idea is simple enough. What makes it work in practice is the tooling and the discipline to use it consistently. Here is how the workflow actually breaks down when you strip out the brochure language.

The Coordination Phase

This is where most projects succeed or fail before anything gets poured. You need a master model that pulls together architecture, structure, MEP, and any specialty systems into one file set. Revit or Navisworks will handle the heavy lifting if your team has already committed to LOD 350 or higher for all disciplines. LOD 200 drawings are not going to cut it here because you cannot run clash detection against schematic-level geometry. I always run coordinated model reviews at the 60 percent, 90 percent, and 100 percent design milestones. Not at the end when the shop drawings come in. By the time fabrication starts, a clash between a ductwork run and a structural beam is an expensive mistake. Fixing it in the model takes maybe twenty minutes. Fixing it after the steel is erected takes a week and a change order. The trick nobody tells you is that the coordination model is only as good as the input data from each trade. I have seen structural engineers drop their models in at LOD 300 with beams that do not include connections, then complain when the MEP rough-in does not fit. Connections matter. A W18x35 with a standard tab seat is a different spatial problem than one with double angles and a stiffener plate. Insist on full connection detail in the model before coordination starts. It adds about 15 percent more modeling time upfront but saves you from three days of field rework per floor.

Get the Full Details

TS Construction & Engineering, LLC | Breckenridge, CO 80424
TS Construction & Engineering, LLC | Breckenridge, CO 80424

Design for Manufacture and Assembly

Once the coordination is locked, the next step is pushing the design toward DfMA principles. That means thinking about how components will be fabricated, shipped, and installed before you sign off on the drawings. Prefabricated MEP racks, modular restroom pods, and precast panel systems all fall under this umbrella now. The counterintuitive part is that DfMA actually requires more detailed design work upfront, not less. You cannot outsource complexity to the field with prefabricated systems because there is no field to fudge things into place. Every penetration, every support, every access panel needs to be documented in the shop drawings. I had a project where we specified a modular mechanical room and skipped detailing the vibration isolation mounts in the model. The manufacturer built exactly what we asked for, which was wrong. The equipment would have been transmitting structure-borne noise into the occupied spaces below. We caught it during shop drawing review, but it set us back six weeks waiting for revised isolation specs. That is the cost of assuming the fabricator will figure it out. They will not.

Quality Control During Execution

This is where Ts Construction Building Excellence Engineering Marvels A Symphony Of Innovation And Expertise either holds up or falls apart. You need measurable quality gates at every stage. Laser scanning as-built conditions after foundation work, before steel erection. Photogrammetry or total station surveys on major structural elements. IAC approval checkpoints on every trade before the next trade is permitted to start. For a typical commercial project of moderate size, laser scanning the slab before steel goes up runs about three to five hours of field time and two hours of processing. The point cloud data lets you verify elevations, column locations, and embed placement across the entire footprint in about an afternoon. Doing that by hand with a level and tape would take two full days and you would still miss things between points. One thing the brochures leave out is that scan-to-BIM registration takes skill. I once worked with a sub who turned in point cloud models that were registered to the wrong datum. The deviations looked acceptable on paper because they were comparing to the wrong baseline. The fix was to pull the original control points from the surveyor and run a residual analysis. It revealed a systematic offset of about 12mm across the entire model. Had we caught that later, it would have been a facade interface disaster.

Where This Approach Breaks Down

Integrated project delivery like this assumes a certain level of team maturity and software infrastructure. If you are working with subs who still submit PDF-only shop drawings and refuse to participate in model coordination, the whole system degrades fast. You end up with a beautifully coordinated master model that has no relationship to what is actually being built. The other bottleneck is cost. DfMA and rigorous quality control add roughly 8 to 12 percent to the preconstruction phase budget. For a fifty million dollar project that is four to six million going into coordination, scanning, and detailed modeling before a single weld is laid. Some owners will not sign that check. Some projects do not need it. A standard warehouse with simple steel framing and basic HVAC does not benefit from this level of rigor. You are better off using conventional plan-and-spec delivery for those and saving the integrated approach for complex facilities, hospitals, labs, or any project where multiple trades intersect in three dimensions repeatedly.

TUD Awards Winner: Excellence in Construction Innovation | The Urban ...
TUD Awards Winner: Excellence in Construction Innovation | The Urban ...

What Actually Moves the Needle

If you are running a project that qualifies for this level of integration, the single highest return activity is early trade contractor involvement. Not subcontractor bidding. Early involvement. Bring the mechanical contractor in at 30 percent design and have them review the model for constructability. They will catch things your engineers miss because they have installed these systems a hundred times and know which configurations cause headaches during field fitting. The second thing is maintaining a live issue log. Not an email thread. A shared tracker that every discipline updates daily with open items, responsible parties, and closure dates. I use a simple cloud-hosted sheet with conditional formatting. Red for overdue, yellow for approaching deadline, green for closed. It takes five minutes a day to maintain and it prevents the classic excuse where every trade claims they raised the issue last month and nobody followed up. There is no software solution that replaces the discipline to keep the model current. Navisworks run weekly clash reports will flag problems, but if the model is two weeks stale because someone changed a wall location in Revit and never updated the coordination file, the clash report is just generating noise. Keep the master model fresh. Update it weekly. Run the clash detection then. That is the routine that keeps these projects on track.

The final thing to accept is that no amount of coordination eliminates all field conflicts. You will still have issues. The difference with a properly integrated approach is that you catch most of them before they become field problems, and the ones you do miss are resolved quickly because everyone is working from the same model and the same coordinate system. That is the actual value proposition. Not innovation theater. Just fewer surprises.